OMNIX logoOMNIXEngineering & Safety
Fire Safety Compliance Support - illustrative
Home  /  Safety  /  Fire Safety Compliance Support
S3 · Compliance

Fire SafetyCompliance Support

Gap close-out · Records · Inspection readiness

Your premises brought in line with the fire safety rules applicable to your occupancy, and kept there — gaps closed out, records in order.

OMNIX is not an empanelled fire agency and does not issue or guarantee any certificate. Applications are yours; decisions rest with the authority.

As perIS 12407IS 12349IS 2189IS 2190IS 3844IS 15105
ScopeFixed-scope and fixed-price, quoted in writing before work begins
RegisterCorrective actions, owners and target dates, kept current through the year
IndependentNo spares to sell, no machine builder to represent
SCROLL
01 · Scope of work

What we deliver.

Every engagement ends in a clear, documented deliverable — measured and actionable, not just observations.

01

Compliance gap review

The premises checked against the rules applicable to your occupancy, gap by gap.

02

Gap close-out

Every gap given an action, an owner and a target date, and tracked to closure.

03

Records brought current

Extinguisher, hydrant, alarm and drill records updated and indexed.

04

Fire plans as per IS 12407

Layout drawings showing fire protection equipment and escape routes.

05

Signage as per IS 12349

Safety signs checked and missing ones listed.

06

Certificate & renewal file

Documents compiled for a Fire Safety Certificate application or renewal, with a renewal calendar.

02 · Approach

How the work is done.

Recognised methods, applied machine by machine and premises by premises — and a written output you keep.

A

Methods

  • Compliance gap review
  • CAPA · gap close-out tracking
  • Document index & registers
  • Fire plan drawings as per IS 12407
  • Renewal calendar
B

What you receive

A compliance file that stays current — gaps closed out, records indexed and drawings prepared — so the premises is ready whenever an inspection or application comes round.

The report is yours either way.
03 · Codes of practice

Checked against Indian Standards.

Inspection, testing and maintenance carried out as per the relevant IS codes of practice.

IS 12407 : 1988Graphic symbols for fire protection plans
IS 12349 : 1988Fire protection — safety signs
IS 2189 : 2026Automatic fire detection & alarm systems — selection, installation & maintenance
IS 2190 : 2024First-aid fire extinguishers — selection, installation & maintenance
IS 3844 : 1989Internal fire hydrants & hose reels — installation & maintenance
IS 15105 : 2021Fixed automatic sprinkler systems — design, installation & maintenance

Indian Standards are cited as the codes of practice the work is checked against. Which of them apply to your premises depends on your occupancy.

04 · Fit

Who it serves.

Independent, fixed-scope and quoted in writing — for units that want condition measured, not guessed.

A

Who it's for

Units that need their fire safety compliance put in order — ahead of a Fire Safety Certificate application or renewal, after an inspection finding, or simply to stay inspection-ready through the year.

B

The OMNIX difference

We do not sell equipment and we do not represent an installer — there is no margin behind the recommendation. The person who inspects your premises is the one who signs the report.

05 · Process

Four steps. No lock-in.

From a free walkthrough to a written report you own — with no retainer and no minimum term.

STEP 01

Site call

A thirty-minute walkthrough at your plant, at no charge. If we cannot add anything, we say so.

STEP 02

Fixed-scope job

One survey or assessment at a price agreed in writing. No retainer, no lock-in, no minimum term.

STEP 03

Written report

Within five working days. Measured values, what the condition is costing you, prioritised actions.

STEP 04

You decide

Act in-house, hand it to your OEM, or bring us back. The report is yours either way.

06 · More in Safety

Related services.

Other work in the safety wing, delivered the same way.

Book a site walkthrough

No charge, no obligation.

Tell us your unit name, location and the equipment or premises concerned. A thirty-minute walkthrough at your plant — travel included within Visakhapatnam city limits, quoted in advance for outstation sites.

NDA signed on request before the first visit.